|
|
|
|
|
|
|
Open Access Transmission Information All transmission service in FERC requires certain transmission
system information be posted on an Open Access Same-Time Information System
(OASIS). The NYISO administrates the OASIS for the transmission system in (1) Standards of Conduct
Employee Transfers Additional Information
(2)
Local Transmission Planning Process · Transmission Planning Guidelines · Local Transmission Plan Assumptions (3)
Transmission Outage Requests/Scheduling ·
System Operations Transmission Outage Request
Form |